Sunday, February 19

October 12, 2011 Construction

Things are progressing and moving right along

Basement 
Basement

Digging Geothermal 
Digging Geothermal

Half Mile of Tubing 
Half Mile of Tubing

Installing
Installing

Dining and Laundry 
Dining and Laundry Rooms

Egress Window 
Egress Window in Basement

Elevator and Study 
Elevator Shaft and Study

First Deck 
First Floor Deck

First Wall
The First  Wall

Front Door 
Front Door

Great Room 
Great Room Wall

Second Deck 
Second Floor Deck

No comments:

Post a Comment